ADMARINE 9

Client : ADES

Duration: 44 days

Major Work:

  • Steel Renewal – 45 MT
  • BOP set back frame fabrication
  • Centrifuge Foundation
  • Wireline Unit Renewal
  • Texas Deck
  • Burner Boom Modification
  • Pipe Renewal – 175 Mtrs.
  • BOP Tugger Winch Pneumatic Lines
  • Cement Unit Lines
  • Mud Lines
  • Iron Rough Neck ST80 Socket Installation

AMBUJA SHIKHAR

Client: Adani

Duration: 51 days

Major Work:

  • Steel Renewal
  • Pipe Renewal
  • Tail Shaft Overhaul
  • Blasting & Painting
  • Valve Overhaul

WILCHIEF

Client: IGOPL

Duration: 58 days

Major Work:

  • Azimuth Thruster
  • Bow & Stern Thruster
  • Steel Renewal
  • Pipe Renewal
  • Blasting and Painting

ADMARINE 10

Client: ADES

Duration: 210 days

Major Work:

  • P&S Burner Boom Installation
  • Burner Boom platform modifications
  • Steel Renewal – 25 MT
  • Pipe Renewal – 822 Mtrs.
  • HP Line renewal
  • Crane Load Testing

ABAN IV

Client: Aban Singapore

Duration: Dec 2023

Major Work:

  • Raw water tower R/R & repairs
  • Steel Renewal – 123 MT
  • Pipe Renewal – 1178 Mtrs.
  • Hydro Blasting – 9890 sqm
  • Anchor handling winches & towing gears servicing
  • Crane boom repairs

Offshore Wellhead Platform

Client: EIL

Duration: Jan 2024

Major Work:

  • Preparation of Fabrication Drawing
  • Material Procurement
  • Structural Pre-Fabrication
  • Erection at Site in Goa
  • Piping Installation
  • Equipment Installation
  • Electrical Installation
  • Painting

SCI YAMUNA

Client: SCI

Duration: 70 days

Major Work:

  • Main Engine O/h
  • Alternators & Motors O/h
  • Shafting
  • Thrusters O/h
  • Steel renewal
  • Valves O/h
  • Pipe Renewal
  • Dry Dock Routines

BARGE URJA

Client: SEROS

Duration: 99 days

Major Work:

  • Steel Renewal – 42 MT
  • Fab & Installation of Life Boat Davit – 62 MT
  • Accommodation repairs
  • Blasting & Painting
  • Hyd. Pipeline renewal – 140 Mtr

LUCKY 7

Client: World Wide Resorts& Entertainment Pvt. Ltd.

Duration: 15 days

Major Work:

  • Steel Renewal
  • Blasting & Painting
  • Propulsion repairs

Tapti Decommissioning Project

Client: BGEPIL

Duration: Feb 2026

Major Work:

  • Jetty Construction Completed
  • MPCB & CRZ License
  • Dismantling Engineering
  • Load-In Support
  • Dismantling of Steel
  • Segregation & Disposal